Selected references |
| |
| 2008 Borehole deviation measurements, Dubai |
Deviation measurements as basis for crosshole seismic
Client: Fugro Middle East, Dubai / U.A.E. |
| |
| 2007 Borehole deviation measurements, Rotterdam |
Deviation measurements of anchor boreholes
Client: Fugro Ingenieursbureau B.V., Leidschendam / Netherlands |
| |
| 2007 Well-logging and TV-inspection of gages and wells, Lainzer Tunnel
|
Sealing-control and test of the hydraulic conditions of groundwater lowering wells and gages
Client: Conrad Brunnenbau GmbH / Austria
|
| |
| 2007 Well-logging and TV-inspection of waterworks Glanegg |
Investigation of a horizontal filter well and tree vertical filter wells to determine the technical state
Client: Salzburg AG / Austria |
| |
2007 Well-logging, Bosrucktunnel
|
Geophysical well logging in 25 horizontal exploration boreholes in bedrock
Client: Bohrgesellschaft Roßla mbH / Germany |
| |
2007 Cavity investigation in a salt mining, Altaussee
|
Spatial detection of a subsurface mining cavity by use of laser scanning
Client Salzburg AG / Austria
|
| |
2007 Borehole deviation measurements, Degendam
|
Deviation measurements of anchor boreholes
Client: Keller Grundbau GesmbH / Germany
|
| |
| 2007 Well-logging, Shereik Dam/Sudan
|
Geophysical well-logging in exploration boreholes for a hydro power project
Client: Building and Road Research Institute (BRRI), University of Khartoum, Shereik/Sudan
|
| |
| 2007 Well-logging in mineral water drillings of Römerquelle |
Well-logging in two mineral water drillings to check cementation and technical conditions
Client: Insond Spezialtiefbau GmbH / Austria
|
| |
| 2007 Well-logging, mineral water drilling "Markusquelle NEU" |
Well-logging in a mineral water drilling in an open borehole and in the completed well
Client: Insond Spezieltiefbau GmbH / Austria
|
| |
2007 Well-logging and TV-inspection of a horizontal filter well, Schüttelau
|
Flowmeter measurements and TV-inspection to determine the technical state of a horizontal water well
Client: Magistrat der Stadt Wien, MA31 - Wiener Wasserwerke / Austria
|
| |
| 2007/2006 Well-logging in the area of Semmering Basistunnel |
|
|
|
Well-logging in 60 exploration boreholes (max. depht about 450m) to
investigate a train path; geophysical coordination of the Project
Client: ARGE Semmering NEU: Habau Hoch- und Tiefbau GmbH, Terrasond GmbH & Co. KG / Austria |
| |
| 2006 Well logging Startschacht Klimtgasse |
|
|
Sealing-control and test of the hydraulic functional efficiency of groundwater-well drop
and float well
Client: STRABAG AG, Direktion IF – Spezialtiefbau / Austria |
| |
| Well logging and TV-inspection in Slovenia |
|
|
Technical control of a Thermal-deep borehole (depth 850 m)
Client: Geoloski zavod Slovenije / Slovenia |
| |
| 2005 Well-logging, BV S10 Mühlviertler Schnellstraße |
|
|
Well-logging in 90 exploritory drillings
Client: Bohrgesellschaft Roßla mbH / Germany |
|
|
|
|
| |
| 2004 S6 – Ganzsteintunnel, well logging |
|
|
Borehole imager measurements and tv-inspection of exlploration boreholes in the Ganzstein-tunnel of the Semmering-freeway
Client: STRABAG AG, Direktion IF -Spezialtiefbau |
| |
| Well logging in the area of Brenner Basistunnel |
|
|
Well logging in the area of the shield design and special civil works
TV-inspection,
well logging and tracer fluid logging for the determination of
hydraulic aquifer parameters from the north range to the Brenner
Basis-tunnel (30 groundwater gages, max. depth ca. 50 m).
Client: Brenner Eisenbahn Gesellschaft mbH / Austria |
| |
| 2004 TV-inspection in Bozen / Italy |
|
|
|
TV-inspection in an open borehole
Client: TERRA Umwelttechnik GesmbH / Austria |
|
|
| |
| 2004 Borehole „Kanina 1“, TV-inspection |
|
|
TV-inspection in a petroleum exploration borehole in Albania for reconnaissance the cementation success of mattock holes
Client: OMV Albanien Onshore Exploration GmbH / Austria |
|
| |
| 2004 Shaftborehole Paierdorf, TV-Inspection of gages and wells |
|
|
TV-inspection of groundwater-gages
and wells for acceptence test of the water maintenance at the
entrance-shaft of the Paierdorf / Koralm-tunnel west
Client: Jäger Bau GesmbH / Austria |
|
|
| |
| 2004 De-nitrification facility Bisamberg, TV-inspection and well logging |
|
|
Technical check and flowmeter tests in vertical wells of an in-situ purification facility for drinking water
Client: evn wasser GesmbH / Austria |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|